Daftar Port Batubara di Indonesia

Berikut ini adalah daftar Port untuk pengangkutan Batubara yang ada di indonesia

Port Pulau Kalimantan – Sewa Kapal Tongkang

1) Apar Bay
Anchor/loading position : 01 – 54 – 00 South / 116 – 37 – 00 East
Loading rate : abt 8,000 – 10,000 mt per day by ship’sgear (iagw)
Loading facility : Ship’s gear / Floating Crane onsubject *)
Port restriction : No restriction, except max draft abt 19m (open sea)
Shipper : Various
Port charges : – Harbour dues : GRT x Usd. 0.035
– Light dues : GRT x Usd. 0.034

2) Adang Bay
Anchorage : 01 – 49 – 03.68 South / 116 – 09 – 30 East
Loading position as per shipper advise :
A) 01– 42 – 00 South / 116 – 38 – 30 East
B) 01 – 42 –30 South / 116 – 38 – 30 East
C) 01 – 43 – 00 South / 116 – 38 – 30 East
D) 01 – 43 – 30 South / 116 – 38 – 30 East
Loading rate : abt 8,000 – 10,000 mt per day by ship’s gear (iagw)
abt 10,000 – 15,000 mt per day per Floating Crane*on subject (iagw)
Loading facility : Ship’s gear
Port restriction : No restriction (open sea)
Draft in anchorage : 16 – 29 mtrs
Shipper : PT. Kideco Jaya Agung
Port charges : – Harbour dues : GRT x Usd. 0.035
– Light dues : GRT x Usd. 0.034

3) Banjarmasin, Taboneo
Anchor/loading position : * Handy 03 – 40 – 00 South / 114 – 26.5 – 00 East (max draft abt 12 – 13m, depth abt 13m)
* Panamax 03 – 41 – 00 South / 114 – 26.5 – 00 East (max draft abt 14 – 15m, depth abt 17m)
* Capesize 03 – 42 – 00 South / 114 – 26.5 – 00 East (max draft abt 18 – 19m, depth abt 20-22m)
Loading rate : abt 10,000 – 15,000 mt per day by ship’s gear (iagw)
abt 15,000 – 20,000 mt per day per Floating Crane (iagw)
Loading facility : Ship’s gear / available one unit Floating Crane (various shippers)
available 4 units floating crane (PT. Adaro Indonesia)
Port restriction : No restriction (open sea)
Shipper : Various / PT. Adaro Indonesia
Port charges : – Harbour dues : GRT x Usd. 0.080 + 10% VAT
– Light dues : GRT x Usd. 0.034

4) Jorong
Anchor/loading position :* Handy 004 – 07.6 South / 115 – 04.5 East (max draft abt 13m)
* Panamax 004 – 11.5 South / 115 – 05.9 East (max draft abt 16m)
* Capesize 004 – 11.5 South / 115 – 05.9 East (max draft abt 16m)
Loading rate : abt 8,000 – 10,000 mt per day by ship’s gear (iagw)
Loading facility : Ship’s gear
Port restriction : No restriction (open sea)
Shipper : PT. Jorong Barutama
Port charges : – Harbour dues : GRT x Usd. 0.035 + 10% VAT
– Light dues : GRT x Usd. 0.034

5) Satui
Anchor/loading position : * Handy 03 – 53.50 South / 115 – 30.50 East (max draft abt 10m)
* Panamax 03 – 56.00 South / 115 – 31.50 East (max draft abt 12m)
* Capesize 03 – 57.00 South / 115 – 37.00 East (max draft abt 16m)
For Arutmin 03 – 57.80 South / 115 – 31.80 East ( max draft abt 14m)
03 – 53.00 South / 115 – 36.00 East (max draft abt 16m)
Loading rate : abt 8,000 – 10,000 mt per day by ship’s gear (iagw)
Loading facility : Ship’s gear / Floating Crane on subject *)
Port restriction : No restriction (open sea)
Shipper : Various / PT. Arutmin Indonesia
Port charges : – Harbour dues : GRT x Usd. 0.080 + 10%VAT
– Light dues : GRT x Usd. 0.034

6) Samarinda
Anchor/loading position : * Jan – Jun : Ma. Jawa 01 – 05 – 00 South / 117 – 15 – 00 East (max draft abt 20m)
* Jul – Dec : Ma. Berau 00 – 15 – 00 South / 117 – 34 – 00 East (max draft abt 25m)
Loading rate : abt 8,000 – 10,000 mt per day by ship’s gear (iagw)
abt 15,000 – 20,000 mt per day per Floating Crane (iagw)
Loading facility : Ship’s gear / Floating Crane
Port restriction : No restriction (open sea)
Shipper : Various
Port charges : – Harbour dues : GRT x Usd. 0.080 + 10% VAT
– Light dues : GRT x Usd. 0.034
– Pilotage : (GRT x Usd. 0.02 + 47.3) x 2 (at Ma Jawa only)

7) Muara. Pantai, Berau
*Shipper PT. Berau Coal
Anchor/loading position : * Capesize 01 – 59 – 80 North / 118 – 09 – 10 East
* Handy & Panamax
Position A) 01 – 59.10 North / 118 – 08.50 East
Position B) 01 – 59.20 North / 118 – 08.90 East
Position C) 01 – 58.60 North / 118 – 08.90 East
Position D) 01 – 58.35 North / 118 – 08.55 East
Position E) 01 – 58.70 North / 118 – 08.20 East
Position F) 01 – 59.20 North / 118 – 08.10 East
Loading rate : abt 8,000 – 12,000 mt per day (iagw) by ship’s gear
abt 15,000 – 20,000 mt per day (iagw) by SST (Semi Submersible Transshipper)
abt 15,000 mt per day(iagw) per Floating Crane, available 2 units
Port charges (Lumpsum) : -Less 40,000 Mt DWT = Usd. 16,000.00
: 40,001-70,000 Mt DWT = Usd. 18,000.00
: Over 70,000 Mt DWT = Usd. 20,000.00
: Cape Size = Usd. 22,000.00

**Shipper PT. Bara Jaya Utama
Anchor/loading position : * Position A) 01 – 57.40 North / 118 – 07.32.40 East
* Position B) 01 – 57.10 North / 118 – 07.22.40 East
Loading rate : abt 8,000 – 12,000 mt per day (iagw) by ship’s gear
abt 15,000 mt per day(iagw) per Floating Crane, available 2 units
Port restriction : No restriction (open sea)
Shipper : PT. Berau Coal / PT. Bara Jaya Utama
Port charges : – Harbour dues : GRT x Usd. 0.035
– Light dues : GRT x Usd. 0.034
– Pilotage In/Out : 2 x (GRT x Usd. 0.036) + Usd. 180

8) Sebuku 
Anchor/loading position : * Handy 03 – 41 – 30 South / 116 – 13 – 00 East (max draft abt 10m)
* Panamax 03 – 41 – 50 South / 116 – 24.4 East (max draft abt 18m-19m)
Loading rate : abt 8,000 – 10,000 mt per day by ship’s gear (iagw)
abt 17,500 mt per day per Floating Crane (iagw)
Loading facility : Ship’s gear / available one unit Floating Crane
Port restriction : No restriction (open sea)
Shipper : PT. Bahari Cakrawala Sebuku
Port charges : – Harbour dues : GRT x Usd. 0.080 + 10% VAT
– Light dues : GRT x Usd. 0.034

9) Tanjung Pemancingan
Anchor/loading position : 03 – 11.5 – 00 South / 116 – 21 – 50 East (max draft 17m)
Loading rate : abt 8,000 – 10,000 mt per day by ship’s gear (iagw)
Loading facility : Ship’s gear / Floating Crane on subject *)
Port restriction : No restriction (open sea)
Shipper : PT. Arutmin Indonesia / various
Port charges : – Harbour dues : GRT x Usd. 0.080 + 10% VAT
– Light dues : GRT x Usd. 0.034

10) Tarakan
Anchor/loading position : 03 – 18 – 20 North / 117 – 33 – 00 East (inside harbour area)
Pilot boarding Position : 03 -14 – 30 North / 114 – 53 30 East
Loading rate : abt 8,000 – 10,000 mt per day (iagw)
Loading facility : Ship’s gear
Port restriction : Draft 12.50 m
Shipper : Various / PT. Baradinamika Suksessarana
Port charges : – Harbour dues : GRT x Usd. 0.088
– Pilotage : (GRT x Usd. 0.018 + Usd. 45) x 2
– Light dues : GRT x Usd. 0.034

11) Tanjung Batu, Tarakan 
Anchor/loading position : 03 – 15 – 00 North / 117 – 44 – 30 East
Pilot Boarding Position : 03 – 14 – 30 North / 117 – 53 – 30 East
Loading rate : abt 8,000 – 10,000 mt per day (iagw)
abt 10,000 mt per day per Floating Crane (iagw)
Port restriction : No restriction (open sea)
Loading facility : Ship’s gear / available one unit Floating Crane
Shipper : PT. Mandiri Inti Perkasa / PT. Pipit Mutiara Jaya
Port charges : – Harbour dues : GRT x Usd. 0.080 +10%
– Pilotage : (GRT x Usd. 0.018 + Usd. 45) x 2
– Light dues : GRT x Usd. 0.034

12) Bontang Coal Terminal, Tg. Meranggas
Pilot station : 00 – 00 – 00 North / 117 – 35 – 00 East
Berth Position : 00- 01- 57 North / 117 – 32 – 02 East
Loading rate : abt 30,000 – 35,000 mt per day (iagw)
Loading facility : Quadrant loader
Port restriction : Draft 13.5m / LOA 250mt / Air draft 16.5m HWL / DWT 95,000mt
Shipper : PT. Indominco Mandiri
Port charges : All in lumpsum asper private terminal port tariff
- DWT 15,000 – 20,000 = Usd. 15,000
- DWT 20,001 – 25,000 = Usd. 20,000
- DWT 25,001 – 30,000 = Usd. 25,000
- DWT 30,001 – 50,000 = Usd. 35,000
- DWT 50,001 – 70,000 = Usd. 40,000
- DWT 70,001 – 80,000 = Usd. 50,000
- DWT 80,001 – 90,000 = Usd. 55,000

13) Balikpapan Coal Terminal (BCT)
Anchorage : Teluk Tebang, 01 – 12 – 00 South / 116 – 47 – 00 East
Pilot Boarding Position : 01 – 21 – 20 South / 116 – 56 – 40 East
Loading rate : abt 30,000 – 40,000 mt per day (iagw)
Loading facility : Loader
Port restriction : Draft 13m / LOA 250m / DWT 90,000mt
Shipper : Various
Port charges : – Harbour dues : GRT x Usd. 0.084 x 120%
– Quay dues : GRT x Usd. 0.101 x p/stay x 120 %
– Pilotage : (2 x GRT x Usd. 0.0299) + (Usd. 62.69 x 2) x 100% x 120% x 115% = X
(2 x GRT x USD 0.0299) + (Usd 46.20 x 2) x 75% x 120% =Y
Total = X + Y
– Light dues : GRT x Usd. 0.034
– Tuggage : 2 x 3hrs x Usd. 1,220 x 115 % x 120%= X
2 x 3hrs x Usd. 0.004 x GRT x 120 % = Y
Total = X + Y

14) Indonesian Bulk Terminal (IBT), South Pulau Laut
Pilot station : 04 – 02 South / 115 – 59 East
Loading rate : abt 35,000 – 40,000 mt per day (iagw)
Loading facility : Fixed luffing / slewing loader
Port restriction : Draft 14.5m / LOA 230m / Beam 35m / Air draft 19m / DWT 80,000mt
Shipper : PT. Adaro Indonesia
Port charges : – Harbour dues : GRT x Usd. 0.080 + 10% VAT
– Quay dues : GRT x Usd. 0.086 x p/stay + 10% VAT
– Pilotage : (GRT x Usd. 0.015 + Usd. 43 x 2) x 2.5 +10% VAT
– Light dues : GRT x Usd. 0.034
– Tuggage asper IBT’s port tariff (in lumpsum)
< dwt =” Usd.”> 45,000 DWT = Usd. 45,000 (excluded tax)

15) Tanjung Bara Coal Terminal 
Pilot station : 00 – 32 – 00 North / 117 – 39 – 30 East
Loading rate : abt 70,000 – 80,000 mt per day (iagw)
Loading facility : Loader ( 2 x Quadrant Type )
Port restriction : Draft 17.25m / LOA 310m / Beam 50 m / Air draft 21m / DWT 210,000mt
Shipper : PT. Kaltim Prima Coal
Port charges : – Harbour dues : GRT x Usd. 0.021 (max 15 day)
– Quay dues : GRT x Usd. 0.0175 x p/stay
– Pilotage : (Usd. 180) + (USD 0.042 x GRT x 2 )
– Light dues : GRT x 0,034 (max 30 days)
– Tuggage including terminal fee asper Tg. Bara Coal Terminal’s port tariff (in lumpsum)
All vessels size = Usd. 28,000

16) Tanjung Bara & Lubuk Tutung Anchorage 
Anchor Position : Lat 00 – 30 – 48 North / Long 117 – 39 – 00 East (Tanjung Bara)
Lat 00 – 43 – 15.93 North / Long 117 – 48 – 18.27 East (Lubuk Tutung)
Port restriction : Draft 25m / LOA 91.5m / Beam 24.4m / Depth 5.5m
Loading rate : abt 8,000 – 10,000 mt per day by ship’s gear (iagw)
abt 15,000 mt per day per Floating Crane (iagw)
Loading Facility : For gearless vessel available FTS (Floating Transfer Station) “Bulk Pioneer”
Port Charges : – Harbour dues : GRT x Usd. 0.021 (max 15 day)
– Light dues : GRT x Usd 0.034 (max 15 day)

17) North Pulau Laut Coal Terminal (NPLCT)
Pilot station : 03 – 12.4 South / 116 – 19.6 East
Loading rate : abt 35,000 – 40,000 mt per day (iagw)
Loading facility : Traveling loader
Port restriction : Draft 15.4m / LOA 320m / Beam 41m / Air draft 17.2m / DWT 150,000mt
Shipper : PT. Arutmin Indonesia
Port charges : – Harbour dues : GRT x Usd. 0.080 + 10%VAT
– Quay dues : GRT x Usd. 0.086 x p/stay +10VAT
– Light dues : GRT x Usd. 0.034
– Pilot/tugs/linesman asper NPLCT’s port tariff (in lumpsum)
DWT upto 25,000 = Usd. 10,000
DWT 25,001 – 35,000 = Usd. 15,000
DWT 35,001 – 50,000 = Usd. 20,000
DWT 50,001 – 85,000 = Usd. 30,000
DWT 85,001 or larger = Usd. 35,000

18) Kumai Bay
Anchorage Position : 03 – 09- 835 South / 1116 – 39 – 054 East
Loading rate : abt 2,000 – 2,500 mt iron ore per day (iagw)
Port restriction : Draft 11 – 13 m
Shipper : PT. Kapuas Prima Coal
Port charges : – Harbour dues : GRT x Usd. 0.080 + 10%VAT
– Light dues : GRT x Usd. 0.034

Port Pulau Sumatra – Sewa Kapal Tongkang

19) Bengkulu 
Pilot station : 03 – 52 – 40 South / 102 – 15 – 45 East
Loading rate : abt 6,000 – 8,000mt per day (iagw)
Loading facility : Loader, no toping off since 1999 due not available barge for transshipment
Port restriction : Draft 9.0m / LOA 195m / Beam 32m
Shipper : Various
Port charges : – Harbour dues : GRT x Usd. 0.080 + 10% VAT
– Quay dues : GRT x Usd. 0.086 x p/stay + 10 % VAT
– Pilotage : (GRT x 0,010 + Usd. 30) x 2 + 10 % VAT
– Light dues : GRT x Usd. 0.034
– Tuggage : 2 x 3hrs x Usd. 1,220 (GRT 18,001 – 40,000) = X
2 x 3hrs x Usd. 0.004 x GRT = Y
Total = X + Y + 10% VAT

20) Pulau Baai anchorage 
Anchor/Loading Position : 03 – 49 – 42 South / 102 – 10 – 79 East (distance fm jetty 10 NM)
Loading rate : abt 7,000 – 8,000 mt per day (iagw)
Loading facility : Ship’s gear & grab
Port restriction : No restriction
Shipper : PT Cormin (Coal Mineral Indonesia)
Port Charges : – Harbour dues : GRT x Usd. 0.080 + 10% VAT
– Light dues : GRT x Usd. 0.034
– Pilotage : GRT x 0,010 + Usd. 30 x 2 + 10% VAT

21) Jambi, Ma. Sabak
Anchor/loading position : 00 – 53 – 50 South / 103 – 48 – 50 East
Loading rate : abt 7,000mt per day (iagw)
Loading facility : Ship’s gear
Port restriction : No restriction (open sea)
Shipper : PT. Sungai Belati Coal
Port charges : – Harbour dues : GRT x Usd. 0.080 + 10% VAT
– Light dues : GRT x Usd. 0.034

22) Padang, Teluk Bayur
Pilot station : 001 – 01 – 10 South / 100 – 22 – 20 East (max draft 13m)
Loading rate : a) abt 5,000 – 6,000mt per day (iagw) – Public wharf
b) abt 10,000mt per day (iagw) – Coal terminal
Loading facility : a) Ship’s gear
b) Loader
Port restriction : a) Draft 9.80m / LOA 225m / Beam 38m
b) Draft 10.2m / LOA 190m / Beam 35m
Shipper : a) Various
b) PT. Bukit Asam
Port charges : – Harbour dues : GRT x Usd. 0.080 +10%VAT
– Quay dues : GRT x Usd. 0.086 x p/stay + 10% VAT
– Pilotage : (GRT x Usd. 0.010) + (Usd. 30 x 2) +10% VAT
– Light dues : GRT x Usd. 0.034
– Tuggage : 2, x 2.5hrs x Usd. 1,220 (GRT 18,001 – 40,000) = X
2, x 2.5hrs x Usd. 0.004 x GRT = Y
Total = X + Y + 10%VAT

23) Tarahan Coal Port 
Pilot station : 05 – 31 – 05 South / 105 – 20 – 21 East
Loading rate : abt 25,000 – 30,000 mt per day (iagw)
Loading facility : Loader
Port restriction : Draft 15 m / LOA 225m / Beam 32.25m / Air draft 15m / DWT 75,000mt
Shipper : PT. Bukit Asam
Port charges : – Harbour dues : GRT x Usd. 0.080 + 10% VAT
– Quay dues : GRT x Usd. 0.086 x p/stay + 10%VAT
– Pilotage : (GRT x Usd. 0.010 + Usd. 34)x 2 +10%VAT
– Light dues : GRT x Usd. 0.034
– Tuggage : 2 x (3hrs x Usd. 1,220 x GRT x 0.004) +10% VAT

24) Kertapati Coal Port, Palembang 
Pilot station : 02 – 11 – 22 South / 104 – 57 – 10 East
Loading rate : abt 5,000 – 6,000 mt per day (iagw)
Loading facility : Loader & Conveyor
Port restriction : Draft 6.80m / LOA 181m / Air draft 11m (enable passing Ampera bridge at inner channel /
special for tug and barge)
Shipper : PT. Bukit Asam
Port charges : – Harbour dues : GRT x Usd. 0.080
– Quay dues : GRT x Usd. 0.086 x p/stay
– Pilotage : GRT x Usd. 0.020 + Usd. 43 x 2
– Light dues : GRT x Usd. 0.034
– Tuggage : 2 x 4hrs x Usd. 145 (GRT 0 – 3,500) = X
2 x 4hrs x Usd. 0.004 x GRT = Y
Total = X + Y

25) Muara Banyu Asin Anchorage, Palembang 
Anchore/Ldg Position : 02 – 11.005 South / 104 – 56.063 East ( distance abt 70 NM fm Kertapati Coal Terminal)
Loading rate : abt 8,000 mt per day (iagw)
Loading facility : Ship’s gear
Port restriction : Max Draft 19 – 21 M
Shipper : PT. Bukit Asam
Port Charges : – Harbour Dues : GRT x Usd. 0.035
– Light Dues : GRT x Usd. 0.034

26) Tembilahan, Sungai Bangkong 
Anchore/Ldg position : 00 – 25 – 00 South / 103 – 47 – 00 East
Loading rate : abt 7,000 – 8,000 mt per day (iagw)
Loading facility : Ship’s gear
Port restriction : Draft 18m LWS
Shipper : PT. Riau Baraharum
Port Charges : – Harbour Dues : GRT x Usd. 0.080 + 10% VAT
– Light Dues : GRT x Usd. 0.034

Port Pulau Jawa – Sewa Kapal Tongkang

27) Cigading
Pilot station : 06 – 00 – 00 South / 105 – 57 – 00 East
Discharging rate : abt 5,000 – 10,000 mt per day (iagw)
Discharging facility : Unloader
Port restriction : Draft 19m / LOA 285m
Consignee : PT. Indocement
Port charges : : – Harbour dues : GRT x Usd. 0.080 + 10% VAT
– Quay dues : GRT x Usd. 0.086 x p/stay + 10% VAT
– Pilotage : GRT x Usd. 0.011 + Usd. 37.40 x 2 + 10% VAT
– Light dues : GRT x Usd. 0.034
– Tuggage : 2 x 3.5hrs x Usd. 1,300 (GRT 40,001 – 75,000mt) = X
2 x 3.5hrs x Usd. 0.002 x GRT = Y
Total = X + Y

28) Paiton, Probolinggo
Pilot station : 07 – 42 – 46 South / 113 – 35 – 30 East
Discharging rate : abt 10,000 – 12,000 mt per day (iagw)
Discharging facility : Ship’s gear
Port restriction : Draft 15m / LOA 430m / DWT 45,000mt
Consignee : PT. Paiton Energy Company
Port charges : – Harbour dues : GRT x Usd. 0.035
– Pilotage : GRT x Usd. 0.010 + Usd. 30 x 2
– Light dues : GRT x Usd. 0.034
– Tuggage charged in lumpsum Usd. 20,000

29) Suralaya
Pilot station : 05 – 54 – 00 South / 105 – 59 – 03 East
Discharging rate : abt 28,000 – 35,000mt per day (iagw)
Discharging facility : Unloader
Port restriction : Draft 13.30m / LOA 245m / DWT 75,000mt
Consignee : Perusahaan Listrik Negara (PLN)
Port charges : : – Harbour dues : GRT x Usd. 0.080 + 10% VAT
– Quay dues : GRT x Usd. 0.086 x p/stay + 10% VAT
– Pilotage : GRT x Usd. 0.011 + Usd. 37.40 x 2 + 10% VAT
– Light dues : GRT x Usd. 0.034
– Tuggage : 2 x 3.5hrs x Usd. 1,300 (GRT 40,001 – 75,000mt) = X
2 x 3.5hrs x Usd. 0.002 x GRT = Y
Total = X + Y

30) Tanjung Jati 
Pilot station : 06 – 24,5 South / 110 – 43,2 East
Discharging rate : abt 38,000 mt per day (iagw)
Discharging facility : Two units Ship’s Unloader
Port restriction : Draft 13.2 m / LOA 250m / DWT 70,000mt
Consignee : Perusahaan Listrik Negara (PLN)

Port charges : – Harbour dues : GRT x Usd. 0.035
– Quay dues : GRT x Usd. 0.0175 x p/stay + 10% VAT
– Pilotage : ((GRT -1000) x 0.012) +27) x2) = 1.75%
– Light dues : GRT x Usd. 0.034
– Tuggage : (Usd. 700 x 2) x 20% (GRT 18,000 – 75,000mt)

31) Tuban 
FOR TANKER
Anchor/Loading position : A) For Panamax Vessel :
Position A) 06 – 38 – 00 South / 111 – 57 – 00 East
Position B) 06 – 39 – 10 South / 111 – 57 – 00 East
Position C) 06 – 39 – 10 South / 111 – 39 – 10 East
Position D) 06 – 39 – 00 South / 111 – 58 – 00 East
B) For Handymax Vessel :
Position A) 06 – 38 – 00 South / 111 – 56 – 00 East
Position B) 06 – 39 – 10 South / 111 – 56 – 00 East
Position C) 06 – 39 – 10 South / 111 – 56 – 90 East
Position D) 06 – 38 – 00 South / 111 – 56 – 90 East

Disch/Loading rate : TBA (depend on type of cargo)
Disch/Loading facility : Hose connect & Pipe line
Port restriction : Draft 9.8m / LOA 140m / DWT 10,000mt
Shiper/Consignee : PT Trans Pacific Petrochemical Indotama (TPPI)
Port charges : – Harbour dues : GRT x Usd. 0.084 +10%VAT
– Light dues : GRT x Usd. 0.034
– Quay Dues : GRT x 0.113 x port stay +10% VAT
– Pilotage : 2 x USD 42 = X
GRT x 0.014 x 2 = Y
Total X + Y + 10% VAT
– Tuggage : USD 400 x 5.5 = X
GRT x 0.008 x 5.5 = Y
Total X + Y + 10 % VAT

FOR COAL 
Anchor position : 06 – 44 – 20 South / 111 – 53 – 20 East
Discharging rate : abt 4,000 – 5,000 mt per day (iagw)
Discharging facility : Ship’s gear
Port restriction : Draft 13m LWS / LOA 190m / 40,000mt
Consignee : Various
Port charges : – Harbour dues : GRT x Usd. 0.084 +10%VAT
– Light dues : GRT x Usd. 0.034
– Quay Dues : GRT x 0.111 x port stay +10% VAT
– Tuggage : 2 x Y hours x GRT 1,500 = Usd. 80 / hr
GRT 1,501 – 8,000 = Usd. 200 / hr
GRT 8,001 – 18,000 = Usd. 400 / hr
GRT 18,001 – 75,000 = Usd. 700 / hr
GRT > 75,000 = Usd. 1,050 / hr

Incoming search terms:

  • mother vessel batubara (28)
  • sewa tugboat (22)
  • vessel batubara (17)
  • sewa tongkang balikpapan (14)
  • sewa tongkang banjarmasin (13)
  • tarakan loading vessel (2)
  • sewa tugboat balikpapan (2)
  • sewa kapal ketaboneo (2)
  • sewa kapal di banjarmasin (1)
  • DRAFT TONGKANG 10000 (1)
This entry was posted in Uncategorized and tagged , , , , , , , , , , . Bookmark the permalink.

Comments are closed.